MINUTES OF THE INFORMAL MEETING OF THE JOHNSON COUNTY
BOARD OF SUPERVISORS:
NOVEMBER 21, 2013
TABLE OF CONTENTS
County Engineer Greg Parker: Right-Of-Way Contract with Janice M. Maier for a Bridge
Replacement, Grading and PCC Paving Project on Sharon Center Road Over Old Man’s
Creek in Section 36, Township 79 North, Range 7 West Known as Johnson County
Project BROS-C052(82)--5F-52; Contract Includes 1.80 Acres of Permanent ROW
Easement at $8,630.00 Per Acre Equaling $15,534.00, $117.00 for Temporary
Construction Easements, and $9,264.00 for Cost to Cure Lost Lane Connection, for a
Total of $25,000.00 (Rounded) .................................................................................................. 1
County Engineer Greg Parker: Quotes Received for the Cold Storage Foundation and Floor
for Building Relocation.............................................................................................................. 2
County Engineer Greg Parker: Other .............................................................................................. 2
Facilities Manager Eldon Slaughter: HVAC Upgrade Project for Administration Building .......... 2
Facilities Manager Eldon Slaughter: Other ..................................................................................... 2
Ambulance Director Steve Spenler: Progress Report ...................................................................... 2
Information Technology Director Jean Schultz: Progress Report ................................................... 3
Reports and Inquiries from Executive Assistant Andy Johnson ...................................................... 3
Reports and Inquiries from the Board of Supervisors ...................................................................... 3
Click here to listen to meeting audio.
Chairperson Rettig called the Johnson County Board of Supervisors to order in the
Johnson County Administration Building at 9:58 a.m. Members present were: John
Etheredge, Pat Harney, Terrence Neuzil, Janelle Rettig, and Rod Sullivan.
COUNTY ENGINEER GREG PARKER: RIGHT-OF-WAY CONTRACT WITH
JANICE M. MAIER FOR A BRIDGE REPLACEMENT, GRADING AND PCC
PAVING PROJECT ON SHARON CENTER ROAD OVER OLD MAN’S CREEK
IN SECTION 36, TOWNSHIP 79 NORTH, RANGE 7 WEST KNOWN AS
JOHNSON COUNTY PROJECT BROS-C052(82)--5F-52; CONTRACT
INCLUDES 1.80 ACRES OF PERMANENT ROW EASEMENT AT $8,630.00 PER
ACRE EQUALING $15,534.00, $117.00 FOR TEMPORARY CONSTRUCTION
EASEMENTS, AND $9,264.00 FOR COST TO CURE LOST LANE
CONNECTION, FOR A TOTAL OF $25,000.00 (ROUNDED)
Assistant County Engineer Rob Winstead said the actual project cost will come out to
$25,000, but the currently listed numbers add up to a slightly smaller number. The
Sharon Center Road Bridge replacement project is nearly ready for the Iowa Department
of Transportation (IDOT) to let it. He referenced a PowerPoint with pictures of the area
and discussed the proposed Right-of-Way contract, the meetings with the current Right-
of-Way owner Janice M. Maier, the temporary construction easements, and the appraisal.
source: johnson-county.com