Test Plan Template 2 - Free Download | Page 8
4.1, 3750 votes
Please vote for this template if it helps you.
Test Plan Template 2 Page 8
Test Plan Template 2
<Project Name>
reports, charts, etc.).]
2.8 TEST SUSPENSION / RESUMPTION CRITERIA
[Describe the suspension criteria that may be used to suspend all or portions of
testing. Also describe the resumption criteria that may be used to resume testing.]
2.9 TEST ENVIRONMENTAL / STAFFING / TRAINING NEEDS
[Describe any specific requirements needed for the testing to be performed
(hardware/software, staffing, skills training, etc).)]
3 CONFORMANCE TESTING
3.1 TEST RISKS / ISSUES
[Describe the risks associated with product testing or provide a reference to a
document location where it is stored. Also outline appropriate mitigation strategies
and contingency plans.]
3.2 ITEMS TO BE TESTED / NOT TESTED
[Describe the items/features/functions to be tested that are within the scope of this
test plan. Include a description of how they will be tested, when, by whom, and to
what quality standards. Also include a description of those items agreed not to be
tested.]
Item to Test Test Description Test Date Responsibility
3.3 TEST APPROACH(S)
[Describe the overall testing approach to be used to test the project’s product.
Provide an outline of any planned tests.]
3.4 TEST REGULATORY / MANDATE CRITERIA
[Describe any regulations or mandates that the system must be tested against.]
3.5 TEST PASS / FAIL CRITERIA
[Describe the criteria used to determine if a test item has passed or failed its test.]
3.6 TEST ENTRY / EXIT CRITERIA
[Describe the entry and exit criteria used to start testing and determine when to
stop testing.]
3.7 TEST DELIVERABLES
[Describe the deliverables that will result from the testing process (documents,
reports, charts, etc.).]
Page 8 of 19
[Insert appropriate disclaimer(s)]
Test Plan Template 2 Previous Page Test Plan Template 2 Next Page
Test Plan Template 2
Previous

8/19

Next