Work Breakdown Structure Template 1 - Free Download | Page 2
4.4, 4445 votes
Please vote for this template if it helps you.
Work Breakdown Structure Template 1 Page 2
Work Breakdown Structure Template 1
Work Breakdown Structure
Work Breakdown Structure Purpose and Limitations
[Replace this text with a statement of the purpose and limitations of this worksheet, or use the
following sample.]
The purpose of this worksheet is to:
Identify the work to be done.
Identify the types of resources required for the work.
Develop estimates for each work element.
Identify storage locations.
This worksheet does not address:
Who will perform the work.
When the work will be completed.
Confidential Page 2 12/17/2014
Work Breakdown Structure Template 1 Previous Page Work Breakdown Structure Template 1 Next Page
Work Breakdown Structure Template 1